Can we assign multiple schedule configurations to a single Operation or Service?

Example 

Schedule 1 is for general maintenance 3rd Tuesday Monthly from 7pm to 11PM -- I want to use this schedule configuration for a group of similar connects to target a whole system with multiple connections, not specific to an individual connection.

Schedule 2 is for general operations that might be different depending on the individual connector (M-F) from 9-10PM - this schedule configuration would be specific to the particular connect not the system as a whole.

Connection (Operation) A - will use both Schedule 1 and Schedule 2, so we can reuse Schedule 2 on similar connections configurations for the same system.

Connection (Service) B - will only use Schedule 2, to allow the service to always listen and restart only when a monthly maintenance event occurs.