Question
· Jun 29, 2017

Deploy Schedules

Hi, we are trying to deployed a changed schedule to our DEV instance (from our TST).  And are getting an error:

SingleFailure: Error during import ERROR <Ens>ErrException: <COMMAND>zImportStream+13^Ens.Util.SettingsDocument.1 -- logged as '-' number - @' tcommit' > ERROR #6315: Errors reporting importing XML subelement in file '/xxx/deploy/Lee-Test.xml' at line '12' offset '40', skipping this item.
 
RequiresManualIntervention: Manual intervention required: Error during import ERROR <Ens>ErrException: <COMMAND>zImportStream+13^Ens.Util.SettingsDocument.1 -- logged as '-' number - @' tcommit' > ERROR #6315: Errors reporting importing XML subelement in file '/xxx/deploy/LGHL7DEV/rollbacks/Rollback_for_HLTHSHR-T-BT2.LHA.ORG_HSDEV_LGHL7DEV_Lee-Test.xml' at line '13' offset '40', skipping this item.

 

Our version

Cache for UNIX (Red Hat Enterprise Linux for x86-64) 2016.1.2 (Build 208_0_16696U) Tue Sep 27 2016 16:29:12 EDT [HealthShare Modules:Core:15.01.6402 + Linkage Engine:15.0.6402]

 

Any suggestions?

Thanks, Nora

Discussion (6)1
Log in or sign up to continue

Here  are the contents of the file:

<?xml version="1.0" encoding="UTF-8"?>
<Export generator="Cache" version="25" zv="Cache for UNIX (Red Hat Enterprise Linux for x86-64) 2016.1.2 (Build 208_0_16696U)" ts="2017-06-27 11:22:07">
<Project name="EnsExportItem_2017-06-27 11-21-11_759-4" LastModified="2017-06-27 11:22:07.698952">
  <ProjectDescription>Studio Project generated starting from Ensemble Production Configuration Item 'LGH.Interfaces : FromSoftLab_HBDFT' at 2017-06-27 15:21:11.759 UTC</ProjectDescription>
  <Items>
    <ProjectItem name="Ens.Util.Schedule.ESD" type="ESD"></ProjectItem>
    <ProjectItem name="Settings:FromSoftLab_HBDFT.PTD" type="PTD"></ProjectItem>
    <ProjectItem name="EnsExportNotes.EnsExportItem_2017-06-27 11-21-11_759-4.PTD" type="PTD"></ProjectItem>
  </Items>
</Project>


<Document name="Ens.Util.Schedule.ESD">
<scheduleSpec>
<schedule><Name>SoftlabDFT</Name><Description>FTP runs 7 times a day to pick up Softlab HB and PB charges</Description><ScheduleSpec>START:*-*-*T03:35:00,STOP:*-*-*T03:40:00,START:*-*-*T06:35:00,STOP:*-*-*T06:40:00,START:*-*-*T09:35:00,STOP:*-*-*T09:40:00,START:*-*-*T12:35:00,STOP:*-*-*T12:40:00,START:*-*-*T15:35:00,STOP:*-*-*T15:40:00,START:*-*-*T18:35:00,STOP:*-*-*T18:40:00,START:*-*-*T21:35:00,STOP:*-*-*T21:40:00</ScheduleSpec><Deployable>true</Deployable></schedule>
<schedule><Name>TopOfHour</Name><Description>FTP runs at the top of the hour for 2minutes</Description><ScheduleSpec>START:*-*-*T*:00:00,STOP:*-*-*T*:02:00</ScheduleSpec><Deployable>true</Deployable></schedule>
</scheduleSpec>
</Document>

<Document name="EnsExportNotes.EnsExportItem_2017-06-27 11-21-11_759-4.PTD"><ProjectTextDocument name="EnsExportNotes.EnsExportItem_2017-06-27 11-21-11_759-4" description="Export Notes for export EnsExportItem_2017-06-27 11-21-11_759-4">
<![CDATA[<Deployment>
<Creation>
<Machine>HLTHSHR-T-BT2.LHA.ORG</Machine>
<Instance>HSTST</Instance>
<Namespace>LGHL7TST</Namespace>
<SourceProduction>LGH.Interfaces</SourceProduction>
<Username>llbrandt</Username>
<UTC>2017-06-27 15:22:07.697</UTC>
</Creation>
<Notes>
<Line num="1">RFC#8678-changing schedule to only run 5 minutes</Line>
</Notes>
<Contents>
<ExportProject>EnsExportItem_2017-06-27 11-21-11_759-4</ExportProject>
<Item num="1">Ens.Util.Schedule.ESD</Item>
<Item num="2">Settings:FromSoftLab_HBDFT.PTD</Item>
</Contents>
<ProductionClassInExport></ProductionClassInExport>
</Deployment>

]]></ProjectTextDocument>
</Document>

<Document name="Settings:FromSoftLab_HBDFT.PTD"><ProjectTextDocument name="Settings:FromSoftLab_HBDFT" description="Settings for FromSoftLab_HBDFT in Production LGH.Interfaces">
<![CDATA[<Item Name="FromSoftLab_HBDFT" Category="" ClassName="LGH.FTP.HL7PassthroughService" PoolSize="1" Enabled="true" Foreground="false" Comment="" LogTraceEvents="false" Schedule="@SoftlabDFT"><Setting Target="Host" Name="TargetConfigNames">SoftLabHBDFT_ToEpic933753_Router,ToSoftLab_HBDFTArchive</Setting><Setting Target="Adapter" Name="ArchivePath">/lgh/ftparchive</Setting><Setting Target="Adapter" Name="StayConnected">0</Setting><Setting Target="Adapter" Name="CallInterval">300</Setting><Setting Target="Adapter" Name="Credentials">softlab-dft</Setting><Setting Target="Adapter" Name="FTPServer">sccmainsrv</Setting><Setting Target="Adapter" Name="FileSpecTS">HOSP_%y%m%d*</Setting><Setting Target="Host" Name="MessageSchemaCategory">SoftLab2.5.1</Setting></Item>
]]></ProjectTextDocument>
</Document></Export>

Here  are the contents of the file:

<?xml version="1.0" encoding="UTF-8"?>
<Export generator="Cache" version="25" zv="Cache for UNIX (Red Hat Enterprise Linux for x86-64) 2016.1.2 (Build 208_0_16696U)" ts="2017-06-27 11:22:07">
<Project name="EnsExportItem_2017-06-27 11-21-11_759-4" LastModified="2017-06-27 11:22:07.698952">
  <ProjectDescription>Studio Project generated starting from Ensemble Production Configuration Item 'LGH.Interfaces : FromSoftLab_HBDFT' at 2017-06-27 15:21:11.759 UTC</ProjectDescription>
  <Items>
    <ProjectItem name="Ens.Util.Schedule.ESD" type="ESD"></ProjectItem>
    <ProjectItem name="Settings:FromSoftLab_HBDFT.PTD" type="PTD"></ProjectItem>
    <ProjectItem name="EnsExportNotes.EnsExportItem_2017-06-27 11-21-11_759-4.PTD" type="PTD"></ProjectItem>
  </Items>
</Project>


<Document name="Ens.Util.Schedule.ESD">
<scheduleSpec>
<schedule><Name>SoftlabDFT</Name><Description>FTP runs 7 times a day to pick up Softlab HB and PB charges</Description><ScheduleSpec>START:*-*-*T03:35:00,STOP:*-*-*T03:40:00,START:*-*-*T06:35:00,STOP:*-*-*T06:40:00,START:*-*-*T09:35:00,STOP:*-*-*T09:40:00,START:*-*-*T12:35:00,STOP:*-*-*T12:40:00,START:*-*-*T15:35:00,STOP:*-*-*T15:40:00,START:*-*-*T18:35:00,STOP:*-*-*T18:40:00,START:*-*-*T21:35:00,STOP:*-*-*T21:40:00</ScheduleSpec><Deployable>true</Deployable></schedule>
<schedule><Name>TopOfHour</Name><Description>FTP runs at the top of the hour for 2minutes</Description><ScheduleSpec>START:*-*-*T*:00:00,STOP:*-*-*T*:02:00</ScheduleSpec><Deployable>true</Deployable></schedule>
</scheduleSpec>
</Document>

<Document name="EnsExportNotes.EnsExportItem_2017-06-27 11-21-11_759-4.PTD"><ProjectTextDocument name="EnsExportNotes.EnsExportItem_2017-06-27 11-21-11_759-4" description="Export Notes for export EnsExportItem_2017-06-27 11-21-11_759-4">
<![CDATA[<Deployment>
<Creation>
<Machine>HLTHSHR-T-BT2.LHA.ORG</Machine>
<Instance>HSTST</Instance>
<Namespace>LGHL7TST</Namespace>
<SourceProduction>LGH.Interfaces</SourceProduction>
<Username>llbrandt</Username>
<UTC>2017-06-27 15:22:07.697</UTC>
</Creation>
<Notes>
<Line num="1">RFC#8678-changing schedule to only run 5 minutes</Line>
</Notes>
<Contents>
<ExportProject>EnsExportItem_2017-06-27 11-21-11_759-4</ExportProject>
<Item num="1">Ens.Util.Schedule.ESD</Item>
<Item num="2">Settings:FromSoftLab_HBDFT.PTD</Item>
</Contents>
<ProductionClassInExport></ProductionClassInExport>
</Deployment>

]]></ProjectTextDocument>
</Document>

<Document name="Settings:FromSoftLab_HBDFT.PTD"><ProjectTextDocument name="Settings:FromSoftLab_HBDFT" description="Settings for FromSoftLab_HBDFT in Production LGH.Interfaces">
<![CDATA[<Item Name="FromSoftLab_HBDFT" Category="" ClassName="LGH.FTP.HL7PassthroughService" PoolSize="1" Enabled="true" Foreground="false" Comment="" LogTraceEvents="false" Schedule="@SoftlabDFT"><Setting Target="Host" Name="TargetConfigNames">SoftLabHBDFT_ToEpic933753_Router,ToSoftLab_HBDFTArchive</Setting><Setting Target="Adapter" Name="ArchivePath">/lgh/ftparchive</Setting><Setting Target="Adapter" Name="StayConnected">0</Setting><Setting Target="Adapter" Name="CallInterval">300</Setting><Setting Target="Adapter" Name="Credentials">softlab-dft</Setting><Setting Target="Adapter" Name="FTPServer">sccmainsrv</Setting><Setting Target="Adapter" Name="FileSpecTS">HOSP_%y%m%d*</Setting><Setting Target="Host" Name="MessageSchemaCategory">SoftLab2.5.1</Setting></Item>
]]></ProjectTextDocument>
</Document></Export>