Ensemble Production Tests with Deferred Responses
Hi all,
I am busy trying out the %UnitTest.TestProduction class to implement some automated production testing.
I have a scenario which I am not sure how to get the final results of for assertion. Below is the scenario I am trying to test, with comments on what I have done.
- Receive a request on a service (Service A).
- Send the request to the BPL
- I use SendMessage of the TestProduction class.
- The BPL sends a request to a Business Operation (SendToProvider)
- The SendToProvider operation sends a message out to the Service Provider.
DeferResponse is done.
It then inserts a table entry linking a Reference from the request to the generated token of DeferResponse
- After this, I check that the table entry inserted correctly and get the Reference value from the table.
- I then simulate a message(delayed response) from the Service Provider to a Business Service, providing the Reference and other values
- The Business Service then gets the Token from the table using the Reference It builds a response and calls SendDeferredResponse. This then responds to the BPLs request that was sent to the SendToProvider operation.
- I need the values of this response to check if the values align with what has been sent in the delayed message from the provider
How do I get this response and/or its values?
Any advice on how to do this will be greatly appreciated.
Product version: Ensemble 2018.1