You might of seen or might of not seen my earlier post about Exporting a Production from 2018.1 to import it into 2021.1. I was able to get the export working, however I noticed in reviewing the data within the export, our previous Workday XML Schemas that we imported via XSD files were not in the export. When walking through the export process under Message Schema or vDoc Schema I could not find the missing XML Schema structures. Why aren't XML's part of the export process if they are used within the Production? Where are the XML Schema's kept within the Ensemble structure so I can see if they can be exported? Thanks Scott Roth